Botany Freight Rail Line

The project involved the installation of a new freight rail track as part of the upgrade of the Port Botany Container Terminal

Client: Savcor

Duration: 2010

Scope of Works:

Civil & Tunnel were engaged by Savor (on behalf of Downer) to supply & construct multiple utility protection slabs ranging in size up to 0.8d x 15l x 10w adjacent to the live freight rail corridor. The scope included:

  • Locating, potholing and exposing existing oil and gas pipelines
  • Detailed excavation foundations
  • Installation of CFA piles and pile caps
  • Formwork
  • Steel Fixing (N36) / Post Tensioning
  • Place & finish concrete